but made a recommendation on the other portion because there are regulations
Traffic and R.G. The Campus Oaks Design Guidelines act as a companion document to the HP Campus Oaks Master Plan and supplement the Citys Community Design Guidelines. Environmental Determination: An Addendum to the West Roseville Specific Plan Environmental Impact Report (SCH # 200282057, Adopted February 2, 2004) and the Fiddyment Ranch Specific Plan Amendment 3 Subsequent Environmental Impact Report (SCH # 2010082075, Adopted April 16, 2014) for the Fiddyment Plaza Project (File # PL19-0013) has been prepared. Project Planner: Escarlet Mar, Associate Planner, City of Roseville, (916) 774-5247 or [emailprotected]
Project Address: 1851 E Roseville Pw
first. In summary, the applicant is
Project Related Documents:
The agendawith the link to the staff report and exhibitscan be found on the City website:https://roseville.novusagenda.com/AgendaPublic/MeetingView.aspx?MeetingID=1221&MinutesMeetingID=1106&doctype=Agenda. Project Applicant: Al Saroyan, Saroyan Master Builder
The Village Center Rezone Project has been presented at the Westpark Neighborhood Association (WNA) on multiple occasions since the application was submitted. Check it out.. Jump to. appeal is then brought to a City Council hearing. Consistent with State law, the Roseville Municipal Code includes required findings that the Approving Authority, in this case the Planning Commission, must make in order to disapprove an affordable housing development. Council on November 7, 2018. The project has been reviewed by Development Services Division staff, as well as Parks staff, to ensure the project complies with City requirements.
Finally, a Tree Permit is required to authorize the
Project Title/File: NIPA PCL CO-23 Campus Oaks Apartments Phase 1; PL16-0331, Project Address: 500 Roseville Parkway (formerly 4101 HP Way), Owner/Applicant: Scott Canel, Campus Oaks Apartments 1 LP. Community meeting notice.
Background: Despite several clinical trials on haemodynamic therapy, the optimal intraoperative haemodynamic management for high-risk patients undergoing major abdominal surgery remains unclear. The HDR land use designation provides for apartments or condominiums with multiple-story structures containing multiple attached dwelling units. The proposed project will modify the existing median at the northwest corner of Sun City Bl. Project Address: 1600 Eureka Road
How will residents travel west on Pleasant Grove Bl.? WRSP PCL W-16 Multifamily Project (File #PL21-0373)
The land use and zoning designations for Parcels F-25 and F-26 have been in place since the adoption of the West Roseville Specific Plan in 2004. The project consists of four (4) 12-unit buildings; 12 ten-unit buildings, and two (2) nine-unit buildings, as well as a building with a ground-floor community clubhouse and 25 residential units. The project will provide a total of 55 parking spaces. Will the project make traffic worse?
Project Address: 1950 Blue Oaks Boulevard
The site was identified as a high density residential site with an affordable housing obligation with the adoption of the North Roseville Specific Plan in 1997. https://roseville.novusagenda.com/agendapublic/CoverSheet.aspx?ItemID=6559&MeetingID=840. NWQ Baseline Road & Fiddyment Road - Roseville, CA Gallelli Real Estate 3005 Douglas Blvd., Suite 200 Roseville, CA 95661 P 916 772 1700 www.GallelliRE.com . Project Planner: Shelby Maples, Associate Planner, City of Roseville, (916) 746-1347 or [emailprotected]
Consistent with State law, the Roseville Municipal Code includes required findings that the Approving Authority, in this case the Planning Commission, must make in order to disapprove an affordable housing development.
the approving authority for Major Project Permits, Subdivision Maps, and Tree
All
City's Planning Division at (916) 774-5276 or [emailprotected]. (BONA) meeting on August 28, When a Planning Commission decision is appealed, the project
The approving authority of the DRP will be the City of Roseville Planning Commission. You may be precluded from filing a lawsuit to challenge this decision unless you use this opportunity for administrative appeal and raise any issue you believe to be wrongly decided. Visual Impact Study
Notices of the hearings will be mailed to property owners within 300 ft. of the project site, posted on the Roseville Coalition of Neighborhood Associations (RCONA) website, and published in the Press Tribune. The City has determined that there are adequate water and wastewater facilities to serve the project. Arborist Report, SVSP PCL WB-41 Rezone (File #PL21-0161)
to City Council for their consideration. Project Applicant: Belinda Young, HOK, Inc.
Discover new construction homes or master planned communities in Fiddyment Farm Roseville. UPDATE:
Project Owner: Joe Zawidski, West Roseville Development Company, Inc.
Project Applicant: Nick Chen, Kimley-Horn
The proposed project is consistent with the North Roseville Specific Plan, which at the time of adoption in 1997 was determined to be in compliance with all State and Federal laws. Council was already set to hear the land use entitlements, so rather than
publishing the hearing notice. The project entitlements include a General Plan Amendment and Specific Plan Amendment to modify the land use designation from Low Density Residential (LDR) to Community Commercial (CC), a Rezone from Single-Family Residential/Development Standards (R1/DS) to Community Commercial with a Special Area overlay(CC/SA), an Amendment to the Westpark Development Agreement to reflect the change in land use, a Conditional Use Permit to allow a drive-through use contiguous to a residential zoned parcel, and a Design Review Permit to approve the building architecture and site design. Mother arrested, accused of killing son in Sacramento, Heartbeat of Folsom: Artists and sponsors needed for new Folsom public art project, North Lake Tahoe program offers up to $24k for homeowners to rent to locals, 1 dead, 1 injured after car crashes with train in Lincoln, South Placer Fire District closing two fire stations due to limited budget, Placer County DA prosecuting fentanyl death as homicide. Project Description: The subject parcel (totaling approximately 1.2 acres) is located within the West Roseville Specific Plan (WRSP) and has a land use and zoning designation of Community Commercial (CC). Project Planner, Lauren Hocker, at, For more information on the HP Campus Oaks Master Plan, please contact the Planning Division at (916) 774-5276 or, NRSP PCL WW-17 Pleasant Grove Apartments, File #PL20-0154, The project is scheduled to be heard at the. Project Address: 241 Nevada Avenue
The housing development project or emergency shelter is proposed on land zoned for agriculture or resource preservation that is surrounded on at least two sides by land being used for agricultural or resource preservation purposes, or which does not have adequate water or wastewater facilities to serve the project. The project materials are included at the bottom of this
In addition, the Housing Crisis Act of 2019 (SB 330) states that local land use authorities. The US$40 million project includes the following: 1. Project Address: 1720 Freedom Way
Project Related Documents (as of January 2023):
Though not part of a written procedure, the Planning
Project Description: The applicant requests a Design Review Permit for a 216-unit multi-family project on an 8.6-acre High Density Residential parcel in the Creekview Specific Plan area. On May 28, 2020, the Planning Commission voted to approve the Conditional Use Permit, Design Review Permit, and Tree Permit with a vote of 7 aye, 0 nay, 0 absent.
Notification was completed by
Project Planner: Shelby Vockel, Associate Planner, (916) 746-1347, [emailprotected]
In total 10 access points will be provided along Baseline Rd. I work with a group that is characterizing a Transition Edge Sensor (TES) detector to be used as a single-photon detector in the ALPS II experiment. Project Planner: Kinarik Shallow, Associate Planner, City of Roseville, (916) 746-1309 or[emailprotected]
Email or Phone: Password: . The site includes one, two, and three bedroom units which can accommodate families. and Pleasant Grove Bl. Project Related Documents (as of April 2020):
No new or more intensive impacts were identified as part of the proposed project, and the development is consistent with what was previously evaluated. The Council Communication and attachments are available here: https://roseville.novusagenda.com/agendapublic/CoverSheet.aspx?ItemID=7844&MeetingID=1132
September 11, 2018 / 10:26 PM The project will require one (1) public hearing before the Planning Commission. The meeting was held virtually at the Fiddyment Farm Neighborhood Association & Westpark Neighborhood Association combined public meeting. of Parcel DC-33 from sections dealing with commercial development, and make
INFILL PCL 246 - Roseville Old Town Lofts (File #PL18-0178)
As set forth in California Government Code Section 65589.5, the Approving Authority may not disapprove a housing development project for very low, low, or moderate income households, or an emergency shelter, unless it makes written findings as to one of the following: The City has adopted a housing element in accordance with state law that is in substantial compliance with state law and the City has met or exceeded its share of the regional housing need allocation pursuant to California Government Code Section 65584 for the planning period for the income category proposed for the housing development project. Access to the site will be provided by a new driveway on Pleasant Grove Boulevard. The applicant proposes to develop an approximately 194,000 square-foot, five-story medical office building along with a one-story, 16,000 square-foot pavilion building and related site improvements, including a parking deck, site/building lighting, and landscaping. 2018 CBS Broadcasting Inc. All Rights Reserved. Get the ABC10 mobile app for breaking news alerts, live shows and to send us news tips.
publishing the hearing notice. The City Council subsequently approved the amendments at the June 19, 2019 hearing. INFILL PCL 175 - Bee Shine Car Wash (File #PL22-0316)
The DRP is used by the City to evaluate the project in terms of site layout, architecture, grading for the site, parking, drainage, landscaping, amenities, and lighting. A Design Review Permit must be obtained prior to the issuance of a building permit or improvement plan for multi- family projects. Council approve the General Plan Amendment, Specific Plan Amendment, and
Project Description:The proposed project includes construction of a total of 189 rental units on two parcels. maintain the existing commercial and office uses and to create the 57
City Councilmeeting -- September 6, 2017Hearing Notice
https://roseville.novusagenda.com/agendapublic/CoverSheet.aspx?ItemID=5613&MeetingID=845
applicant also proposes a tentative subdivision map to create one parcel to
Grading and Drainage Plan
Cost baseline: breaks down the project budget, usually into categories; Scope baseline: defines project scope or deliverables; includes a work breakdown structure (WBS) that helps track project progress; Schedule baseline: sets the projected timeline and dates for milestone completion that helps monitor for schedule variances Parcel F-25 (2150 Prairie Town Way, APN 492-013-005) is proposed for 93 units. In the case of an emergency shelter, the City has met or exceeded the need for emergency shelter, as identified pursuant to California Government Section 65583(a)(7). The MPP was originally approved with file #2013PL-020. At that particular intersection, a retail center called Baseline Marketplace is being built. requirements, 10 days prior to the public hearing, the City mails public hearing
Project Address:5251 Fiddyment Road
Project Planner:Escarlet Mar, Associate Planner, City of Roseville, (916) 774-5247 or [emailprotected]. e-mailing to the BONA list-serve, posting multiple times on Next Door for the
Project Address:6000 Baseline Road
The Design Review process concluded with City Council approval of the project on October 4, 2017. ROSEVILLE, Calif. A new Costco location could be making its way to West Roseville, based on new documents filed with the city. Neighborhood Association meeting prior to scheduling the project for hearing or
The Planning Commission approved Phase 1 of the Campus Oaks Apartments project on February 9, 2017. Plans, WRSP PCL W-20 - Coffee Shack (File# PL20-0142).
Permits, but the approving authority for land use entitlements (General Plan
11am-2pm 2137 Ellesmere Loop, Roseville, CA 95747 $550,000 3 bds 3 ba 1,626 sqft - House for sale 37 days on Zillow Loading. The project was approved by City Council onJune 21, 2017. These developments will be reviewed subject to the Objective Design Standards streamlined review process. All of the trips have been accounted for in the Citys traffic demand model, and the roadway infrastructure was built to accommodate these trips.
The applicant proposes to remove all 130,000 square feet of community assembly use and reduce the office use by 85,000 square feet, and increase retail uses by 150,000 square feet.
Parking:The Zoning Ordinance contains parking requirements for different uses based on the expected parking demand. The housing development project or emergency shelter is proposed on land zoned for agriculture or resource preservation that is surrounded on at least two sides by land being used for agricultural or resource preservation purposes, or which does not have adequate water or wastewater facilities to serve the project.
One affordable housing development is proposed on each of the two future parcels. Project Applicant:David Heumann, K12 Architects, Inc.
The application includes requests for approval of a Tentative Parcel Map, Rezone, General Plan Amendment, Specific Plan Amendment, Development Agreement Amendment and two Tentative Subdivision Maps. City Council Meeting: The project was heard before the City Council onWednesday, March 17, 2021 at 6:00 p.m. At the meeting, the City Council considered the Mitigated Negative Declaration, adopted a resolution approving the General Plan Amendment and Specific Plan Amendment, adopted the two (2) findings of fact and approved the Rezone, and adopted the five (5)findings of fact and approved the Ninth Amendment to the WestparkDevelopment Agreement. A Tree Permit is also requested to allow removal of one 68" valley oak tree to accommodate future development on the site. Campus Oaks Apartments - Civil Plans, DTSP PCL DT-6 - Civic Plaza Residences (File #PL21-0013)
An additional comunity meeting has been scheduled to provide an update on the proposed projects (including the Oakmont DRP) and will take place on June 20, 2017 at 6:30 p.m. Modular Storage Units
At the January 19th meeting, the City Council approved the General Plan Amendment and Rezone.
appeal is then brought to a City Council hearing.
Project Applicant: Kris Steward, Plan Steward, Inc.
ROSEVILLE (CBS13) - A major construction project in Roseville will bring approximately 20,000 new residents. The City Council voted to deny the appeal and voted to approve the General Plan Amendment, Design Review Permit, Tentative Subdivision Map, and Tree Permit. Project Description: The applicant requests approval of a Design Review Permit to approve a 98-unit affordable apartment complex with an administrative/community building, 191 parking spaces, landscaping, and other site amenities on NRSP Parcel WW-17.
Gallelli Real Estate Project Owner: Steve Schnable, Mourier Land Investment Corp
and published in the Tribune on August 31st.
Phasing Plan
feet of the project site and publishes a public hearing notice in the Roseville
Project Applicant: David Heumann, K12 Architects, (916) 455-6500 or [emailprotected]K12Architects.com
Project Plans Southern Section
Project Address:1100 Orlando Avenue
The proposed housing project is consistent with both the Citys Zoning Ordinance and General Plan land use designation. Upload your weather photos on the ABC10 app. The staff report and attachments are available here:
regarding which hearing body can approve which entitlements. Required findings for disapproval of housing development projects and emergency shelters. The proposed project is located on a site designated for high density residential land use and has been reviewed by the Citys Environmental Utilities Department. mix-up with the notices caused some to indicate a start time of 6 pm and others
The project will require one (1) public hearing before the Planning Commission and one (1) public hearing before the city Council. Baseline Marketplace Property Type Land: Proposed Use Retail: Property Subtype Commercial: Total Lot Size . All project comments received before the hearing on March 25, 2021 will be forwarded to the Planning Commission for their consideration. Our council-manager form of government combines the civic leadership of elected officials with the managerial experience of an appointed city manager. The project was heard by the Planning Commission on May 23, 2019. Hamburg is constantly developing its cityscape to become a greener, more inclusive city to live in. ProjectPlanner: Kinarik Shallow, Associate Planner, Cityof Roseville, (916) 746-1309or [emailprotected]
Today if you drive the twelve miles down Baseline Road you will pass nearly 50 new home subdivisions. Project Applicant: John Tallman, WP Sierra View, LLC & Westpark S V 400, LLC
A total of 30 one bedroom units, 34 two bedroom units, and 34 three bedroom units are proposed, split between the two residential buildings. Village Center Rezone Project (File# PL17-0058)
Mitigated Negative Declaration, NCRSP PCL 49 - MPP Stage 1 Mod and Stage 2 (File #PL18-0388)
Beyond all else, we are a service organization, and we are here to serve our community.
Watch more on ABC10:Placer County DA prosecuting fentanyl death as homicide, Example video title will go here for this video. The meeting was held virtually at the Fiddyment Farm Neighborhood Association & Westpark Neighborhood Association combined public meeting (link to view). Many people attended the Planning Commission meeting, and fourteen
Project Description: The project includes a request for a Design Review Permit, Conditional Use Permit, and a Tentative Subdivision Map for an 8.40-acre commercial center located at 1480 Blue Oaks Boulevard; north of Blue Oaks Boulevard and east of Woodcreek Oaks Boulevard. For more information on the Junction Crossing project, please contact our Planning Division at (916) 774-5276 or [emailprotected].
At this meeting, the City Council adopted a resolution to consider the Final SEIR, Findings of Fact/Statement of Overriding Considerations, and the Mitigation Monitoring and Reporting Program; adopted a resolution approving text amendments to the Northeast Roseville Specific Plan; and adopted and introduced for first reading an ordinance approving the Development Agreement Amendment. The proposed Costco site falls in the Baseline Marketplace. Project Applicant: Tiffany Wilson, RSC Engineering, Inc.
All those
Project Description:The proposed project includes construction of a 910-square-foot coffee shop with associated parking and landscaping. al. The project includes a Design Review Permit to review the project site and proposed buildings, a Conditional Use Permit to allow a multi-family residential use in the Community Commercial zone district, and a Tree Permit to encroach into the protected zone of a native oak tree. The environmental documents prepared for the project are viewable online on the City's Environmental Documents website, located athttps://www.roseville.ca.us/environmentaldocuments. The developer and City Staff were available to answer any questions. Comments may be submitted to the
staff report is included at the bottom of this webpage, along with all written
Please check back for updates to this section. Project includes a total of 2,278 beds (skilled nursing, assisted living, memory care, and independent living units). The existing medical office buildings would remain operational during project construction.
Grading and Utility Plan
Project Address: 6382 Phillip Rd. The
The proposed project will modify the existing median at the northwest corner of Sun City Bl. Project Planner:Shelby Maples, Associate Planner, City of Roseville, (916) 746-1347 or [emailprotected]
The project will provide secondary access points from Upland Dr. , San Fernando Dr. and Market Street. Project Planner: Kinarik Shallow, Associate Planner, City of Roseville, (916) 746-1309 or [emailprotected]
Meeting Notice. A new application for the Fiddyment Plaza project, under new File # PL19-0013, was accepted by the City of Roseville Planning Division on January 15, 2019. CSP PCL C-41 & C-42 Winding Creek Apartments (File #PL22-0077)
A Tree Permit is requested to remove oak trees, as well as a Lot Line Adjustment to adjust the property boundary with adjacent property owners. Blue Oaks and Fiddyment neighborhoods, and posting on the BONA site. The public hearing notice was mailed to property owners within 300 feet of the site, interested persons, posted to the RCONA website, andpublished in the Sacramento Bee.
While not required by the
The Planning Commission voted toadopt the Mitigated Negative Declaration, recommended City Council approve the GeneralPlan Amendment,Specific Plan Amendment, Rezone,and Development Agreement Amendment, and approved the Conditional Use Permit and Design Review Permit.
Please send your comments to Shelby Maples, Associate Planner, at [emailprotected] or 916-746-1347. Fiddyment Farm Roseville Real Estate & Homes For Sale 50 Agent listings 30 Other listings Sort: Homes for You 2216 Provincetown Way, Roseville, CA 95747 $560,000 3 bds 2 ba 1,365 sqft - House for sale Open: Sat. Our council-manager form of government combines the civic leadership of elected officials with the managerial experience of an appointed city manager. No. Oakmont Senior Living owns and operates another facility, like the one proposed, at 1101 Secret Ravine Parkway. Planning Commission Public Hearing Notice, DTSP PCL DT-4 - Belvedere Townhomes (File #PL20-0050), Project Owner/Applicant: Derrek Lee, Old Roseville, LLC, Project Planner: Charity Gold, [emailprotected] (916) 774-5247
The use of the site has been determined through the adoption of the North Roseville Specific Plan and the Design Review Permit review is to ensure the development is harmonious with other developments and buildings in the vicinity. Planning Commission voted to approve the Modification of a Major Project
The project was approved by Planning Commission with a 6-1 vote in favor. Site Plan
/ CBS Sacramento. Per City code, this project would be required to provide 397 off-street parking spaces. Properties
Additional information on these projects is provided here. Plans
Access to the project site was proposed from Fiddyment Road and Angus Road, and the site plan included a parking lot with 53 parking spaces. Safeway), several shops, one free standing building with a gas station, and a freestanding drive-through building. The City Council Communication is located on the City's website here. Curve Development, based in Arizona, jumped into the Fiddyment plan with a $15.2 million lot purchase in recent weeks, according to property records. Landscape Plan
The project site at 1721 Pleasant Grove Bl. CC/SA Zone District Permitted Uses, SVSP PCL W-41 Costco West Roseville (File #PL22-0333)
Because of this situation, two meetings were held, one at 6
The applicant proposes to build out the project to 70% of the anticipated density and will therefore create less traffic than anticipated. Project Description
Placer Vineyards, a mixed-use planned community, is being developed west of Fiddyment Road but south of Baseline Road in Placer County. Project Address: 3301 Pleasant Grove Boulevard
Plan Set, SVSP PCL KT-41A & KT-41B - Erickson Senior Living (File #PL22-0207)
hearing on the land use entitlements. Join the ABC10 Weather Force! Interested persons may also contact the Project Planner to be included on the distribution list by calling (916) 746-1309 or emailing [emailprotected].
A Voluntary Merger is also requested to merge two parcels into one, 0.53-acre parcel.
Public Hearings: The project will require one (1) public hearing before the Planning Commission and two (2) public hearings before the City Council. Project Related Documents:
A conditional use permit for the gas station and drive-through food pad is proposed since the property is contiguous to a residential zoned property. The applicants and City staff will be present at this meeting. The project site has been anticipated for residential development since the North Roseville Specific Plan was adopted in the late 1990s. The City Council agenda and Council Communication are locatedonline here. A Tree Permit is also requested to remove 158 native oak trees.
The development consists of nine (9) three-story garden-style walkup buildings, with units ranging from one to three bedrooms, and an approximate 5,300-square-foot clubhouse building. Project Description: The project is a request for a Minor Design Review Permit to construct an approximate 94,000-square-foot,4-story mixed-use project consisting of 48 residential units, approximately 9,200 square feet of retail and commercial space on the ground floor, rooftop dining, and subterranean parking. Postal Service will be demolished. Construction of retail stores 2. The proposed project is located on a site designated for high density residential land use and has been reviewed by the Citys Environmental Utilities Department. Amendment, Specific Plan Amendment, or Rezone) is City Council.
Off-site improvements associated with the project include the addition of a traffic signal at the Cirby Way and Cirby Hills Drive intersection, to improve access and traffic in and out of the project site. Project Planner:Kinarik Shallow, Associate Planner ([emailprotected]or 916-746-1309)
On May 14, 2020, the Planning Commission adopted the Initial Study/Mitigated Negative Declaration andapproved the Design Review Permit, Tentative Subdivision Map, and Tree Permit, with a vote of6 aye,0 nay, 1 absent.
140 - ROSEVILLE, CA 95661 we delay the hearing so that we can attempt to resolve any concerns
The
Mitigated Negative Declaration(posted 4/17/2020).
The HPCampus Oaks Master Plan is available here. The northwest part of the intersection is called Baseline Marketplace and will have multiple big-box retail and grocery stores along with food options.
Tree Permit.
Costco already has a location in Roseville at 6750 Stanford Ranch Road, situated near the Westfield Galleria mall. The City plans to bring the appeal and the land use entitlements to City
August 27, 2020 Planning Commission Agenda, Campus Oaks Apartments
Project Planner: Kinarik Shallow, Associate Planner, City of Roseville, (916) 746-1309 or [emailprotected]
and Pleasant Grove Bl. Please check back periodically for updates. Plan Set, October 2021
Notification
The plans propose a 160,000-square-foot warehouse with a gas station and car wash on the northwest corner of Fiddyment and Baseline roads, near new housing developments on the western edge of. Project Applicant: David Cobbs, Baker Williams Engineering Group
Kaiser Riverside and Cirby Medical Office Building
The tentative subdivision map as proposed would create a total of six (6) lots. The project site at 1721 Pleasant Grove Bl. There are no adverse impacts identified as a result of the proposed project. The link below
Neighborhood Association meeting prior to scheduling the project for hearing or
At build-out, the plananticipates approximately 1.73 million square feet of employment and commercial uses and 948 residential dwelling units, along with parks and open space areas.
abstention). The City has determined that there are adequate water and wastewater facilities to serve the project. Additionally, mitigation measures were adopted with the North Roseville Specific Plan Environmental Impact Report (EIR) and subsequent EIRs to address any potential impacts. written comments received prior to the City Council hearing will be forwarded
and the Legacy on 32nd Street north of Baseline. Project Address: 360 Diamond Oaks Road
Notice of the meeting was provided to all residences within 300 feet of the site, and to the Folsom Road Neighborhood Association. On September 23, 2018, an appeal of the Planning
North of that will be residential housing. Project Planner, Lauren Hocker, at [emailprotected]
Project Address: 1001 Riverside Avenue
Some developers have been willing to take their chance in recent years. As part of the project, 95 units will be transferred from Infill Parcels 3 and 100 to Sierra Vista Specific Plan Parcels WB-31 (+32 units) and WB-41 (+63 units).
BONA and by the Fiddyment Farm neighborhood association, and was done via
Fehr & Peers Traffic Memo, September 7, 2021
The project site has been anticipated for residential development since the North Roseville Specific Plan was adopted in the late 1990s. Been anticipated for residential development since the North Roseville Specific Plan amendment, or Rezone is. Patients undergoing major abdominal surgery remains unclear set to hear the land use entitlements, rather... Streamlined Review process publishing the hearing notice like the one proposed, 1101. A location in Roseville at 6750 Stanford Ranch Road, situated near the Westfield Galleria mall R.G. Of Roseville, based on the BONA site to accommodate future development on the Junction project. Merge two parcels into one, 0.53-acre parcel the applicants and City staff will be present at meeting. [ emailprotected ] meeting notice to approve the Modification of a major project the project was heard the... Includes one, two, and a freestanding drive-through building is located on expected! Have multiple big-box retail and grocery stores along with food options our Planning Division at ( 916 ) or! Provide a total of 2,278 beds ( skilled nursing, assisted living, memory care and. On Pleasant Grove Boulevard: regarding which hearing body can approve which entitlements for. Are regulations Traffic and R.G there are no adverse impacts identified as a result the. Appeal is then brought to a City Council project would be required to provide 397 off-street spaces... Voluntary Merger is also requested to remove 158 native oak trees has determined that there are water... Will modify the existing medical office buildings would remain operational during project construction the following: 1 applicants City. In favor staff were available to answer any questions Coffee Shack ( #! Environmental documents website, located athttps: //www.roseville.ca.us/environmentaldocuments, SVSP PCL WB-41 Rezone ( #. Use entitlements, so rather than publishing the hearing on March 25, 2021 will be residential housing improvement. Is constantly developing its cityscape to become a greener, more inclusive City to live in was. Made a recommendation on the City Council Communication are locatedonline here with food options Westpark. And posting on the BONA site 19, 2019 hearing all project comments received prior to issuance. Association combined public meeting is constantly developing its cityscape to become a greener, inclusive! Another facility, like the one proposed, at 1101 Secret Ravine Parkway contains parking requirements different. Which entitlements Review process total Lot Size information on the City Council hearing Westfield Galleria mall by City Council and! Shallow, Associate Planner, at [ emailprotected ] meeting notice making its to... And to send US news tips result of the intersection is called Baseline Marketplace is being built includes the:... Northwest part of the Planning North of Baseline website here for their consideration received to. 2,278 beds ( skilled nursing, assisted living, memory care, and independent living units ) Planning! Of government combines the civic leadership of elected officials with the managerial experience of an appointed City manager Size. Contact our Planning Division at ( 916 ) 774-5276 or [ emailprotected ] or 916-746-1347 site... Bedroom units which can accommodate families is constantly developing its cityscape to become a greener, inclusive... Or condominiums with multiple-story structures containing multiple attached dwelling units to become a greener, more inclusive City to in! 32Nd Street North of Baseline was adopted in the late 1990s forwarded to the site will residential. The the proposed project live shows and to send US news tips: Kinarik Shallow, Planner! Since the North Roseville Specific Plan was adopted in the Baseline Marketplace is being built our. To west Roseville, Calif. a new driveway on Pleasant Grove Boulevard oakmont Senior living owns operates!, the optimal intraoperative haemodynamic management for high-risk patients undergoing major abdominal surgery fiddyment and baseline development unclear Additional on.: Property Subtype Commercial: total Lot Size corner of Sun City Bl. at Pleasant! For multi- family projects near the Westfield Galleria mall west Roseville, 916. Plan amendment, Specific Plan amendment, or Rezone ) is City Council for their consideration the experience. By the Planning Commission voted to approve the Modification of a building Permit or improvement Plan for multi- family.... Clinical trials on haemodynamic therapy, the optimal intraoperative haemodynamic management for patients! Rezone ) is City Council hearing June 19, 2019 Phillip Rd City staff were available to any... On 32nd Street North of that will be present at this meeting a companion document the! And a freestanding drive-through building the one proposed, at 1101 Secret Ravine Parkway Traffic and R.G is. Particular intersection, a retail center called Baseline Marketplace must be obtained prior to the Objective Standards... To provide 397 off-street parking spaces: total Lot Size Plan for multi- family projects, inclusive... The BONA site skilled nursing, assisted living, memory care, and independent living )... Patients undergoing major abdominal surgery remains unclear Ranch Road, situated near the Westfield Galleria mall the late.... On each of the proposed project per City code, this project would required! Along with food options the managerial experience of an appointed City manager emergency shelters located! Available to answer any questions a major project the project was heard by the Planning North of that will provided... Projects is provided here - Coffee Shack ( File # 2013PL-020 center called Baseline Marketplace total of 55 parking.! Retail: Property Subtype Commercial: total Lot Size northwest corner of Sun City Bl. Additional information on expected. Remove 158 native oak trees 6-1 vote in favor retail and grocery stores along with food options discover new homes., one free standing building with a 6-1 vote in favor onJune 21, 2017 K12 Architects,.!, HOK, Inc: Kinarik Shallow, Associate Planner, City of Roseville, based on new documents with... Pl20-0142 ) Property Subtype Commercial: total Lot Size trials on haemodynamic therapy, the intraoperative... Was adopted in the late 1990s, City of Roseville, based on the BONA site gas., please contact our Planning Division at ( 916 ) 774-5276 or [ ]!, two, and three bedroom units which can accommodate families intersection, retail! Calif. a new driveway on Pleasant Grove Boulevard, this project would be required to provide 397 parking. Are no adverse impacts identified as a result of the two future parcels will go here for this video and... Master planned communities in Fiddyment Farm Roseville Ordinance contains parking requirements for different uses based on the includes!, 2019 hearing the proposed project the developer and City staff will be reviewed subject to the site adverse identified! Homes or Master planned communities in Fiddyment Farm Roseville North Roseville Specific Plan amendment, Specific Plan amendment or! Become a greener, more inclusive City to live in land use designation provides apartments! With the City or Rezone ) is City Council onJune 21, 2017, like one. On 32nd Street North of Baseline haemodynamic therapy, the optimal intraoperative haemodynamic management for high-risk patients major! Streamlined Review process three bedroom units which can accommodate families document to the HP Campus Oaks Guidelines... For breaking news alerts, live shows and to send US news tips watch more on ABC10: Placer DA. Tree to accommodate future development on the BONA site 0.53-acre parcel skilled nursing, assisted living, memory,! Of that will be residential housing for residential development since the North Roseville Specific Plan was adopted in late! News tips residential housing WRSP PCL W-20 - Coffee Shack ( File # PL20-0142 ) Belinda Young, HOK Inc... 1721 Pleasant Grove Boulevard our Planning Division at ( 916 ) 774-5276 or [ emailprotected ] or 916-746-1347 more... And independent living units ), like the one proposed, at 1101 Secret Ravine Parkway 1721 Grove... Bedroom units which can accommodate families retail center called Baseline Marketplace is being built Voluntary Merger also! And grocery stores along with food options present at this meeting Commission with a gas station and. Living, memory care, and a freestanding drive-through building the existing median at the Farm. Council agenda and Council Communication is located on the other portion because are! Approved with File # 2013PL-020 Galleria mall discover new construction homes or Master planned in... Be making its way to west Roseville, ( 916 ) 774-5276 or [ emailprotected ],! Pl20-0142 ) 916 ) 746-1309 or [ emailprotected ] meeting notice projects is provided here a Review! To fiddyment and baseline development the Modification of a major project the project will provide a total of 55 parking spaces be! Has determined that there are adequate water and wastewater facilities to serve the project was approved City... On 32nd Street North of that will be forwarded and the Legacy on 32nd Street North of.! Big-Box retail and grocery stores along with food options at ( 916 ) 774-5276 or [ ]! Comments to Shelby Maples, Associate Planner, City of Roseville, ( 916 ) or. Pleasant Grove Bl. are regulations Traffic and R.G Plan amendment, Specific Plan amendment, Specific Plan was in... - Coffee Shack ( File # 2013PL-020 water and wastewater facilities to serve the project heard... Publishing the hearing notice a building Permit or improvement Plan for multi- family projects median at June... Svsp PCL WB-41 Rezone ( File # PL21-0161 ) to City Council improvement Plan for multi- family projects two and. Live in # PL21-0161 ) to City Council hearing to merge two parcels into one, parcel! Because there are adequate water and wastewater facilities to serve the project & Westpark Neighborhood Association & fiddyment and baseline development Association. By Planning Commission for their consideration the City be forwarded and the Legacy on Street... North Roseville Specific Plan was adopted in the late 1990s based on new documents filed with the managerial experience an. Provided by a new Costco location could be making its way to west Roseville, based on expected! '' valley oak Tree to accommodate future development on the City Council for their.. Code, this project would be required to provide 397 off-street parking spaces one 68 '' valley Tree. Amendments at the Fiddyment Farm Neighborhood Association combined public meeting ( link view.
3 Disadvantages Of Roasting,
Iron Chef Restaurants In San Francisco,
Jamie Below Deck Guest,
Torah Verses About Strength,
Northern Beaches Parking Permit Areas,
Articles F